Kimbolton Castle, Kimbolton

Client: Kimbolton School
Location: Kimbolton Castle
Contractor: Herringbone Restoration
Programme: 6 months

Clipsham stone replacements carried out on a “like for like” basis, iron cramps causing expansion over a period of time. These were carefully removed and replaced with new stainless steel replacements.

Mortar repairs carried out with both NHL 2.0 and NHL 3.5 to conserve openings in original stone along with lime mortar pointing to high level parapets and ashlar.